TL;DR
Homeowner Kathryn Stalnak spent $7,500 renovating a 1960s bathroom before moving into her apartment. A neutral palette, mauve-veined floor tile and a Calacatta marble-topped vanity shaped the redesign, which she completed with professional contractors.
Homeowner Kathryn Stalnak renovated her 1960s bathroom for $7,500 before moving into her apartment, replacing dingy tile and mildew-prone cabinets with a new vanity, neutral finishes and professional tile installation. The makeover’s defining detail is a floor tile with mauve veining, which Stalnak said adds depth to the otherwise restrained palette.
Get furniture and decor delivered free with Prime
- Fast, free delivery on millions of items
- Prime Video, Amazon Music and more included
- Member-only deals all year
Stalnak began demolition soon after closing on the apartment, rather than living with the existing bathroom and renovating later. She said she had considered waiting, but decided it would be easier to complete the work before moving in. Contractors helped with the renovation, which included a new vanity, shower tile and floor tile.
The vanity, topped with Calacatta marble, was one of the first choices she made. Stalnak said it helped guide the rest of the design. It also provides built-in compartments for hair dryers, straighteners and hairspray, with additional storage space left unused, according to her account.
For the floor, she chose a pale tile marked by mauve veining after considering stronger wall colors, including pink and red. In the shower, she used shiny tan tile laid vertically. Stalnak said the floor tile caught her attention in the store and became a feature visitors notice. She also selected a light fixture, a tufted rug and artwork and decorative objects to personalize the finished room.
Neutral finishes,
elevated detail
Kathryn Stalnak updated a 1960s bathroom before moving in, pairing a calm palette with distinctive tile and practical storage.
A palette built from materials
The vanity and floor tile set the direction; neutral shower tile kept the finishes cohesive.
Marble-topped vanity
Calacatta marble guided the design, while built-in compartments keep styling tools organized.
Mauve-veined floor
Pale tile adds color and depth without relying on a bold wall shade.
Vertical tan tile
Shiny tile laid vertically brings texture while staying within the neutral palette.
Before and after
- Mildew-prone cabinets
- Sheet mirror and dingy-looking tile
- Built-in soap holders lost to demolition
- New vanity, shower tile and floor tile
- Coordinated neutral finishes with mauve accents
- Prints and decorative objects personalize the room
Planning choices that mattered
The timing and material decisions reflected Stalnak’s move and her experience with this project.
She chose the vanity first, then used its marble to guide the other finishes.
Demolition began after closing so she could avoid living through the bathroom work.
Professionals helped with the renovation and tile installation; she selected the layout.
Useful lessons, with limits
| Project detail | What the account says |
|---|---|
| Tile size | Larger tiles cost less in her project, including installation. |
| Materials | She sourced them herself and could return leftover supplies to Floor & Decor. |
| Budget detail | The $7,500 total has no itemized labor or materials breakdown. |
Tile Choices Shaped the Renovation
The project illustrates how a bathroom’s overall character can come from a small number of coordinated material choices rather than a bold wall color. Here, the marble-topped vanity and veined floor tile established the palette, while the tan shower tile kept the room within a neutral range. That combination let Stalnak add visual variation without making the finishes compete, based on her description of the design.
Her account also offers practical details for readers planning similar work. Stalnak said larger tiles cost less than smaller ones in her project, including in installation, and described professional help as worth the expense. Those observations are specific to her renovation; the article does not provide a general price comparison or a breakdown of labor and material costs.
Timing was another factor. Starting demolition before she moved in meant Stalnak did not have to live through construction in the bathroom. That approach may not suit every household or budget, but her decision shows how the condition of a newly acquired home and a planned move can affect when a renovation happens.
Products Worth Considering

Hisense 75-Inch E6SR Series Hi-QLED 4K UHD Smart Roku TV (2026 Model)

Bose SoundLink Max Portable Bluetooth Speaker, IP67 Waterproof, Black

Sonos Era 100 SL Compact Microphone-Free Speaker, Black
As an affiliate, we earn on qualifying purchases.
A 1960s Bathroom Before Move-In
The bathroom was part of an apartment Stalnak described as a 1960s blank slate. Before the work, she disliked the mildew-prone cabinets, a sheet mirror and tiles that she felt looked dirty. She liked built-in soap holders on the backsplash, but said they would not survive demolition. The reported $7,500 project replaced the room’s main finishes and fixtures rather than preserving those features.
Stalnak said developing a clear design direction was among the hardest parts of the process. She used Pinterest for inspiration and began with the vanity, then selected materials around it. Although she considered painting the walls pink or red, the floor tile’s mauve markings gave her a way to add color while retaining an overall neutral scheme.
The work also involved decisions about tile placement and ordering. Stalnak said the contractors asked whether she wanted the tile laid horizontally or vertically, and she chose a vertical arrangement for the shower. She sourced materials herself and said leftover supplies could be returned to Floor & Decor, which helped her avoid paying for excess materials she did not use.
Project Costs and Timeline Details
The reported $7,500 total is not accompanied by an itemized budget, so the division among labor, tile, fixtures and other materials is unclear. The renovation’s exact start and completion dates, the bathroom’s dimensions and the amount of time the work took were also not provided. No independent cost estimate or comparison is included.
Stalnak’s comments about larger tile costing less, including for installation, reflect her experience with this project. The details do not establish that larger formats will be cheaper in every renovation, since prices can vary by material, room layout, installer and other project conditions. The account also does not specify the tile brands or exact product models used for the floor and shower.
Personal Details Complete the Room
The renovation is described as complete, and Stalnak said decorating became her favorite part of the process. She added framed prints above the toilet, including gifts from an uncle who collects antiques and prints, along with a tray holding candles and fragrances. Those objects gave the finished bathroom a personal layer beyond its new tile and fixtures.
No further construction, additional spending or future renovation plans were reported. The next step described in the account is simply continued use of the completed space, which Stalnak said has become her favorite room in the apartment.
Key Questions
How much did Kathryn Stalnak’s bathroom renovation cost?
The reported cost was $7,500. No itemized breakdown of labor, materials or fixtures was provided.
What tile did she choose for the bathroom?
Stalnak chose floor tile with mauve veining and shiny tan tile for the shower. She said the floor tile added depth to the neutral palette and became a talking point with visitors.
Why did she renovate before moving in?
Stalnak said she decided it would be easier to complete the renovation before she moved into the apartment. She began demolition after closing.
Did contractors work on the renovation?
Yes. Stalnak said professional contractors helped complete the project, including tile installation and decisions about how the tile would be laid.
What parts of the old bathroom did she dislike?
She singled out mildew-prone cabinets, a sheet mirror and dingy tiles that seemed to look dirty. Built-in soap holders were one feature she liked, but she said they would not survive demolition.
Source: apartmenttherapy.com
